Bring the System Online
Task List: Activate the System
462
SI Installation and Upgrades
June 2004
Figure 171: Make sure the disk is not write protected
Return to Task List
Power Up AC-Powered System
Return to Task List
1
Set the associated circuit breakers on the AC power panel ON.
NOTE:
If the system is high or critical reliability, power-up the Expansion Port Network (EPN)
first, then the Processor Port Network (PPN). Always power up the control cabinet last.
2
At the rear of each cabinet, set the circuit breaker to ON. This starts the system initialization and
test. Some red lights may be on but will be turned off by other procedures in this chapter.
Power Up DC-Powered System
Return to Task List
1
At the DC Battery Cabinet (if installed), set the circuit breaker to ON.
2
At the DC Power Cabinet, set the circuit breakers on the associated rectifiers ON.
This starts the system initialization and test. Some red LEDs may be on but are turned off by other
procedures in this section
3
At the rear of each Power Distribution Unit (if installed), set the circuit breaker to ON.
NOTE:
If the system is high or critical reliability, power-up the Expansion Port Network (EPN)
first, then the Processor Port Network (PPN). Always power up the control cabinet last.
Return to Task List
Figure notes
1
Not write protected
2
Write protected
h1dfdsk KLC 091799
1
2
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...