Release 9si/10si/Communication Manager 1.x to Communication Manager 2.1
Task list: R9si/10si/Communication Manager 1.x to Communication Manager 2.1
48
SI Installation and Upgrades
June 2004
Check link status
Return to Task List
This optional step is to make sure the links are in service before and after the upgrade.
1
Type
display communication-interface links
and press Enter. Write down all enabled links.
2
Type
status link
number
and press Enter for each enabled link.
3
Write down which links are enabled and in service.
NOTE:
If any links are enabled and out of service, resolve the problem before continuing the
upgrade.
4
Type
list signaling group
and press Return.
Note the signaling groups listed by number.
5
For each of the signaling groups listed, type
status signaling group
<number>
and press
Return.
6
If any of the links are not up, take the necessary corrective action to restore the link before
continuing with the upgrade.
Return to Task List
Save translations
Return to Task List
NOTE:
Duplicated translations must match exactly or the command fails.
High and Critical Reliability
1
Execute
status system 1
before you save translations.
2
Verify that conditions are normal (this can take as long as 5 to 10 minutes). If the system refuses
to go into a normal condition, refer to the maintenance procedures; if that fails, escalate the
problem.
All
1
Ensure that the translation card (ATA) is in the TN2401 (Netcon/Pkt Intf) circuit pack’s card slot.
2
Type
save translation
and press Return to write all translations from memory to the translation
flashcard (about 10 minutes).
The screen goes blank. This is normal.
NOTE:
Do not press any keyboard key until after the system displays the status (success or
failure) message. If you press Return again, you will not see the status message.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...