Links and FAQs
Frequently Asked Questions
860
SI Installation and Upgrades
June 2004
Back to top of page
DEFINITY Carrier /
Backplane
Equipment
Notes
SCC1 Processor Cabinet
J58890L-2 List 25
This replaces List 10
SCC1 Processor Cabinet
(Survivable Remote)
J58890L-2 List 31
This replaces List 30
SCC1 Processor Cabinet
(Knock Down)
J58890L-2 List 52
This replaces List 51
Backplane for the J58890L-2
List 25, List 31, and List 52
Cabinets
PWJ58890AL-1 List 3
This backplane replaces List 2
Backplane for the J58890L-2
List 25, List 31, and List 52
Cabinets
PWJ58890AL-1 List 3
with a label on the left-
rear of the SCC1
identifying the quick-fix
backplane.
This backplane, a List 2 with a CRW1,
Series 2, bridge card installed, is
electrically equivalent to the
PWJ58890AL-1,L3 backplane.
This backplane replaces List 2.
SCC1 Duplication Processor
Cabinet
J58890M-2 List 15
This replaces List 7
SCC1 Duplication Processor
Cabinet (Knock Down)
J58890M-2 List 52
This replaces List 51
Backplane for the J58890M-2
List 15 and List 52 Cabinets
PWJ58890AM-1 List 3
This backplane replaces List 2
MCC1 SI Processor Carrier
J58890AH-2 List 13
This replaces List 10
MCC1 SI Processor Carrier
(Knock Down)
J58890AH-2 List 55
This replaces List 54
Backplane for the J58890AH-2
List 13 and List 55 Cabinets
PWJ58906AA-1 List 4
This backplane replaces List 3
MCC1 SI Duplication
Processor Carrier
J58890AJ-2 List 12
This replaces List 9
MCC1 SI Duplication
Processor Carrier (Knock
Down)
J58890AJ-2 List 55
This replaces List 54
Material required in addition to
L55 (Knock Down)
J58890AJ-2 List 56
This replaces List 53
Backplane for the J58890AJ-2
List 12 and List 55 Cabinets
PWJ58906AB-1 List 3
This backplane replaces List 2
Fiber Optic Cable: MCC1 Dup-
Int
848204434
14” cable
Fiber Optic Cable: SCC1 Dup-
Int
LL2SC-SC-10
107122640
10’ cable
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...