G3V4vs/R5vs/R6vs to Avaya Communication Manager
Task List: DEFINITY vs to Avaya Communication Manager
SI Installation and Upgrades
157
June 2004
Remove ground connections [from
G3V4vs/R5vs/R6vs]
Return to Task List
1
Remove the 6 AWG (#40) (16-mm
2
) ground wire from the ground block on the rear of the G3vs
system.
This wire later attaches to the new control cabinet.
2
Remove the 10 AWG (#25) (6-mm
2
) coupled bonding conductor (CBC) wire from the ground
block on the rear of the G3vs system.
This wire later attaches to the new control cabinet.
Return to Task List
Move 25-pair cables from G3V4vs System from
G3V4vs/R5vs/R6vs
Return to Task List
1
Remove any reusable 25-pair cables from the rear of the old system.
For G3vs upgrades
Cables connecting the wall-mount G3vs and the si cabinet may be too short. If so,
replace these cables with new, longer cables.
2
Attach any reusable 25-pair cables to the needed connectors on the rear of the si cabinet.
3
Attach any new 25-pair cables to the needed connectors on the rear of the si cabinet.
4
Route the new cables to the MDF and attach.
Return to Task List
Move management terminal cable from
G3V4vs/R5vs/R6vs
Return to Task List
1
Remove the management terminal cable from the rear of the G3vs.
2
Attach the management terminal cable to the rear of the si system.
Return to Task List
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...