Install Fiber Optic Cable Pass-Thru Kit for SCC1 (Single-Carrier) Cabinets
Install the fiber optic cable pass-thru kit (SCC1)
198
SI Installation and Upgrades
June 2004
Figure 25: Secure the I/O cable connector
Install the Fiber-optic Cable with the Pass-thru Kit
Return to Task List
CAUTION:
During the actual installation of fiber optic components, use either all beige or all blue
adapters. Beige denotes multimode fiber and blue denotes single-mode fiber. Do not mix
beige with blue.
1
Snap the beige SC-SC fiber optic adapter onto the pass-thru tool. See
Figure 26, Fiber optic
adapter and pass-thru tool,
on page 200.
Use the beige adapter even if single-mode fiber is being installed. The beige adapter is better
suited for cable routing in the next steps.
If single-mode fiber is being installed, the beige adapter will be replaced with a blue adapter later.
2
From the front of the cabinet, insert the pass-thru tool into the opening between the bottom of the
circuit packs and the circuit pack label. See
Figure 27, Insert the pass-thru tool,
on page 200.
fodatie LJK 041398
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...