Install and Connect MCC1 (Multicarrier) Cabinet
Task List: Connect AC power and ground
SI Installation and Upgrades
339
June 2004
Return to Task List
Connect Battery Leads (J58890CH-1)
Return to Task List
Figure 91, Typical Small Battery Assembly,
on page 339 shows a typical optional small battery holdover
assembly. These assemblies may ship with the battery leads disconnected to prevent the batteries from
discharging.
1
Plug the battery connector into the -48 VDC Batteries connector on the rear of the J58890CH-1
Power Distribution Unit.
CAUTION:
Power is present in the cabinet even if the AC power cable is unplugged. When procedures
require ALL power to be removed from the cabinet and to prevent unnecessary
discharging of the battery, turn off the main circuit breaker located on the front of the
power distribution unit.
2
Be sure the main power to the power distribution unit is OFF.
3
At the power distribution unit, set all carrier circuit breakers OFF.
Figure 91: Typical Small Battery Assembly
Return to Task List
psdfbatb RPY 061797
Battery
connector
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...