Option Switch Settings
Task List: Data Module Switches and Options
SI Installation and Upgrades
745
June 2004
Set 7400D Options
Return to Task List
The following steps are an example of how to change the default setting of 9600 to the custom setting of
19200.
NOTE:
If the link is between a R10r and a CMS, set the 7400D to 19200. If the link is between
any other system and a CMS, leave the speed of the 7400D set at 9600.
1
From the HOME screen, press NEXT/NO until
SET OPTIONS ?
is displayed.
2
Press ENTER/YES to stay in the
SET OPTIONS ?
menu.
3
Press NEXT/NO until
SET 9600 SPEED ?
is displayed.
4
Press ENTER/YES when
SET 9600 SPEED ?
is displayed.
5
Press NEXT/NO when
9600 = ON ?
is displayed.
6
Press ENTER/YES when
9600 -> OFF ?
is displayed.
7
Press ENTER/YES when
CONTINUE ?
is displayed.
8
Press ENTER/YES when
SET 19200 SPEED ?
is displayed.
9
Press NEXT/NO when
19200 = OFF ?
is displayed.
10
Press ENTER/YES when
19200 -> ON ?
is displayed.
11
Press NEXT/NO when
CONTINUE ?
is displayed.
12
Press ENTER/YES when
19200 -> ON ?
is displayed.
13
Press ENTER/YES when
SAVE CHANGES ?
is displayed.
NOTE:
The
SET OPTIONS ?
menu cannot be terminated if all speeds are set to off.
Return to Task List
Set 7400A and 7400B Options
Return to Task List
Determine if the 7400A or 7400B will be interfacing with D-lead modems or attention control modems.
Use
Table 36
to interface with either modem. You can set options for the 7400B through a dumb terminal.
.
Table 36: Options for D-Lead and Attention Control Modems
Set Option Display
Option
D-Lead
Settings
Attention
Control Settings
Set 300 Speed?
300
Note 1
Note 1
Set 1200 Speed?
1200
Note 1
Note 1
1 of 2
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...