Install Additional Hardware
Task List: Add CallVisor ASAI
SI Installation and Upgrades
587
June 2004
b
Open the License Installation Tool (LIT) application at your laptop/PC.
c
Use the LIT instructions to add a switch connection profile to the tool.
d
Use the LIT instructions to install the License File on the switch.
e
If the system has IP endpoints registered, and you unplugged the Ethernet cable from the
TN799 (C-LAN) circuit pack, replug the cable.
This re-registers the IP endpoints.
Save Translations (CallVisor ASAI)
Return to Task List
1
If the system is high or critical reliability, type
status system 1
and press Enter
to verify that the
system is in the
active/standby
mode.
2
Type
save translation
and press Enter. This instructs the system to take all translation
information in memory and write it to the translation cards.
Add Circuit Packs (CallVisor ASAI)
Return to Task List
1
Determine port assignment of circuit packs to be added.
2
Install the appropriate circuit packs in assigned cabinet slot (as required).
NOTE:
A vacant port is required on a TN556D ISDN—BRI circuit pack.
Return to Task List
Install Cables (CallVisor ASAI)
Return to Task List
1
Install cables from cabinet to the MDF as required.
Enter Added Translations (CallVisor ASAI)
Return to Task List
1
Administer the required translation data using the forms listed under “Adjunct/Switch
Applications Interface (ASAI)” in the Administrator's Guide for Avaya™ Communication
Manager (555-233-506).
Resolve Alarms (CallVisor ASAI)
Return to Task List
1
Examine the alarm log.
2
Resolve any alarms that may exist using the Maintenance for Avaya DEFINITY® Server SI (555-
233-123) documentation for your system.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...