Install and Administer Trunks
Install ISDN—PRI Trunks
SI Installation and Upgrades
667
June 2004
Task List: Installing ISDN—PRI Trunks
1
Installing ISDN - PRI in North American
on page 667
2
Installing ISDN - PRI Internationally
on page 667
3
Add Packet Bus Support (ISDN PRI)
on page 668
4
Add Circuit Packs (ISDN PRI)
on page 668
5
Install Cables (ISDN PRI)
on page 668
6
Enter Added Translations (ISDN PRI)
on page 668
7
Resolve Alarms (ISDN PRI)
on page 668
8
Save Translations (ISDN PRI)
on page 668
Return to Task List
Installing ISDN - PRI in North American
Return to Task List
1
Use a TN767E (or later) DS1 or a TN464GP DS1/E1 circuit pack for a signaling link and up to 23
ISDN — PRI Trunk Group members.
2
Install a Tone-Clock circuit pack to provide synchronization for the DS1 circuit pack.
3
If using a TN464GP, then packet bus support has not been added, requiring greater than 4 PRI
signaling groups, see
Add Packet Bus Support
on page 588 for installation of additional circuit
packs for packet bus support.
As an option to the TN768 or TN2182B Tone-Clock, a TN780 Tone-Clock (installed in the PPN) can
interface external Stratum 3 synchronization for DS1.
Return to Task List
Installing ISDN - PRI Internationally
Return to Task List
1
Install a TN464GP (or later) DS1/E1 circuit pack for the assignment of the 2 signaling channels
and up to 30 ISDN — PRI Trunk Group members. Each E1 span provides 32 ports.
2
Install a Tone-Clock circuit pack to provide synchronization for the DS1/E1 circuit pack.
3
If packet bus support has not been added and greater than 8 PRI signaling groups are required, see
Add Packet Bus Support
on page 588 for installation of additional circuit packs for packet bus
support.
As an option to the TN2182B Tone-Clock, a TN780 Tone-Clock (installed in the PPN) can interface
external Stratum 3 synchronization for DS1.
Return to Task List
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...