Install and Connect SCC1 (Single-Carrier Cabinets)
Task List: Install a J58890CG DC Power Distribution Unit
376
SI Installation and Upgrades
June 2004
Installing on a wall with a plywood backing plate
1
Hold the unit at the desired location and mark the four hole (slots and keyholes) centers with a
pencil.
NOTE:
The J58890CG DC Power Distribution Unit should be installed to the right of the SCC
Cabinet Stack and mounted approximately 12 inches (30.5 cm) off the floor.
2
Use a level to make sure the power unit is straight, then set the unit aside and install two #12 pan
head phillips wood screws (rated for at least 50 lbs each) in the top position.
3
Mount the power distribution unit on the top screws and install the bottom screws through the
slots in the power distribution housing.
Return to Task List
DC Power Connections with DC Distribution
Unit
A 10 foot (3 meter) power cord is equipped with the appropriate connectors. In the configuration shown
in
Figure 115, Connections Using DC Power Distribution Unit,
on page 378, each cabinet stack has a DC
Power Distribution Unit associated with it.
Stacking DC Power Cabinets
Up to three DC Power Cabinets can be stacked to supply power to Single-Carrier Cabinet stacks. See
Figure 116, DC Power Cabinet Stack — Rear,
on page 379.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...