Install and Connect SCC1 (Single-Carrier Cabinets)
Task List: Connect the cabinet grounds on the J58890R DC Power Cabinet and the Single-Carrier Cabinets
SI Installation and Upgrades
373
June 2004
Figure 112: DC Power Distribution Unit Ground
Return to Task List
Connect Single-Carrier Cabinet Ground
Return to Task List
1
Measure and cut a length of 4 AWG (#5) (21 mm
2
) wire long enough to reach between the
GROUND DISCHARGE bar on the DC Power Cabinet and the single-point ground block on the
Control Cabinet (bottom cabinet in
Figure 113, Single-Carrier Cabinet Ground,
on page 374).
2
At the DC Power Cabinet, connect the 4 AWG (#5) (21 mm
2
) wire to the GROUND
DISCHARGE bar.
3
Route the wire to Control Cabinet and connect to the single-point ground block.
4
Repeat for each Control Cabinet in the system room (duplicated Control Cabinet and Expansion
Control Cabinet).
j58890r1 RBP 042296
Figure notes
1
DC Power Cabinet
2
DC Power Distribution Unit
3
Ground Discharge Bar
4
4 AWG (#5) (21 mm
2
) Wire
5
GRD Connector Terminal on DC Power Distribution
Unit
6
To Additional DC Power Distribution Units (if
required)
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...