System 75 Small-Cabinet to R8si (Blowback)
Task List: System 75 Small Cabinet to R8si
SI Installation and Upgrades
297
June 2004
4
Behind the cabinet, remove all of the back panels.
Two different types of screws hold the back panels to the cabinet. Remove the #10 screws with a
screwdriver or a 1/4-inch socket. Remove the #12 screws with a screwdriver or a 5/16-inch
socket.
Return to Task List
Disconnect TDM cables [75 small upgrade]
Return to Task List
NOTE:
Before disconnecting each cable adapter, note its position.
Remove all of the TDM cables and AHF103 TDM cable adapters. They will not be reused.
Return to Task List
Remove circuit packs (A carrier only) [75 small upgrade]
Return to Task List
NOTE:
This procedure is for single-carrier systems
only
.
!
WARNING:
Before inserting or removing a circuit pack from a cabinet, put on a wrist strap and attach
its plug or clip to the cabinet’s frame.
1
To ensure that the port circuit packs in the A carrier are properly replaced, label each component
with its slot number.
2
Disconnect the power cords from the power units in the A carrier.
3
Remove all circuit packs and power units from carrier A. Store the circuit packs in the static-proof
packaging.
4
Remove circuit-pack blanks from the slots that do not contain circuit packs.
5
Remove the front trim plate from the A carrier by pulling straight off.
Return to Task List
Remove circuit packs (A and B carriers) [75 small upgrade]
Return to Task List
NOTE:
This procedure is for A and B carrier systems only.
!
WARNING:
Before inserting or removing a circuit pack from a cabinet, put on a wrist strap and attach
its plug or clip to the cabinet’s frame.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...