Bring the System Online
Administering the Circuit Packs
SI Installation and Upgrades
449
June 2004
Administering the Circuit Packs
After the equipment is installed (including circuit packs), the circuit packs must be administered. This
section provides brief information about:
•
Administration Commands
on page 449
•
Change Circuit Packs Form
on page 450
•
Change Circuit Pack Form Implementation Notes
on page 451
Refer to the Administrator’s Guide for Avaya Communication Manager (555-233-506) for more
information.
In general:
•
Use the Circuit Packs screen to administer circuit packs to carrier slots. The circuit packs must be
installed (or assigned using the Circuit Packs form) before administering voice terminals,
attendant consoles, or trunks.
•
Each page represents one carrier in the cabinet shown on the command line. All carriers and slots
appear even if they are not included in the hardware.
•
It is not necessary to fill in the Circuit Packs screen if the circuit packs are installed at the time of
administration.
•
For initial installation, assign circuit packs to slots using the hardware configuration layout record
from the factory or Customer Services Organization. Do not arbitrarily assign circuit packs to
slots.
•
For r: If the carrier type administered on the Cabinet Administration form does not match the
physical hardware, question marks (
??
) may display in the
Code
fields.
For si: When a circuit pack in a slot differs from what has been administered on the form,
#
displays between the
Sfx
and
Name
fields.
•
For r: The number of slot fields displayed represents administrable slots for the given carrier
type.
For si: All slot fields are displayed.
Administration Commands
Use the following administration commands to administer the Circuit Pack form.
NOTE:
If no cabinet number is specified, this command defaults to “1.”
Action
Object
Qualifier
change
circuit-packs
xx (cabinet number)
display
circuit-packs
xx (cabinet number) [’print’ or ‘schedule’]
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...