Install Additional Hardware
Task List: Add Packet Bus Support
SI Installation and Upgrades
589
June 2004
Disable Alarm Origination (Packet Bus Support)
Return to Task List
1
Type
change system-parameters maintenance
and press Enter.
2
Set the
Alarm Origination Activated
field to n.
CAUTION:
If you do not disable Alarm Origination, the system may generate alarms, resulting in
unnecessary trouble tickets.
3
For some releases of software, disable
Cleared Alarm Notification
and
Restart
Notification
before submitting the form.
Return to Task List
Save Translations (Packet Bus Support)
Return to Task List
If standard reliability:
1
Type
status system 1
and press Enter
to verify that the system is in the
active/standby
mode.
If high or critical reliability:
1
Type
status system 1
and press Enter
to verify that the system is in the
active/standby
mode.
2
Type
save translation
and press Enter. This instructs the system to take all translation
information in memory and write it to the translation card.
3
If the system contains a TN750/B Announcement circuit pack, type
display announcements
and
press Enter. If administered recorded announcements are listed, type
list configuration
software-version
long
and press Enter. To save the announcements, type
save announcements
and press Enter.
Return to Task List
Power Down Cabinet (Packet Bus Support)
Return to Task List
1
At the PPN, set the main circuit breaker to OFF.
2
At an EPN, set the main circuit breaker to OFF.
Install Circuit Packs (Packet Bus Support)
Return to Task List
Install the appropriate circuit packs. See
Circuit Pack Locations for Packet Bus in PPN
.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...