R5/R6/R7/R8si to Avaya Communication Manager
Task List: R5/R6/R7/R8si to Avaya Communication Manager
120
SI Installation and Upgrades
June 2004
Figure 1: Fiber optic cable connecting the two TN792 duplication interface circuit packs
(multicarrier cabinet only)
Return to Task List
Install TN2404 and TN2401 circuit packs and
original translation card(s) [from
R5/R6/R7/R8si]
Return to Task List
NOTE:
If you are upgrading a duplex installation, install the circuit packs on both SPEs.
NOTE:
Avaya Communication Manager is loaded onto the TN2404 processor circuit pack. If you
received an orange software flashcard, read the Software Release Letter that accompanied
it for further instructions.
fodf792 KLC 090399
C
A
R
D
I
N
U
S
E
AL
AR
M
S
EM
ER
TR
C
A
R
D
I
N
U
S
E
AL
AR
M
S
EM
ER
TR
B
AU
TO
A
OVERIDE
S
P
E
Lucent
EM
ER
TR
B
AU
TO
A
OV
ERIDE
S
P
E
Lucent
B
A
B
A
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...