Add IP Solutions
Task list: Install the TN802B in Media Processor mode
SI Installation and Upgrades
617
June 2004
We recommend that you protect your cabinet with an uninterruptible power system (UPS).
If adding a TN799DP C-LAN circuit pack:
•
An unoccupied port slot for the TN799DP, if needed. If you have an existing TN799x circuit pack,
replace it with the TN799DP.
•
A 10 BaseT Ethernet connection into your local area network for the TN799DP.
•
One or more valid, unused IP addresses on your network that can be assigned to the IP Interface
server.
Return to Task List
Check your shipment
Return to Task List
When your DEFINITY IP Interface Assembly order arrives at your site, check the contents (see
Required
Hardware on page 617
).
1
Inspect the shipping carton for damage before opening it. If the box is damaged, do not open it.
Inform the shipping company, and ask for instructions on filing a claim.
2
If the box is undamaged, check the contents against the packing slip. Check the condition of each
component, and note any damage or shortages on the packing slip. See
Required Hardware on
page 617
for what the carton should contain for each IP Interface ordered.
3
Read and follow any directions inserted into the package by the factory.
The TN802B external cable assembly is a bundle of cables with an amphenol connector at the end of the
bundle and various PC-type connectors (VGA, Universal Serial Bus [USB], mouse, keyboard, Ethernet,
modem, and COM2) at the ends of the individual cables. See
Figure 240, TN802B IP Interface External
Cable Assembly,
on page 618. Look for the label where the bundle enters the amphenol connector.
Required Hardware
Description
Quantity
TN799x C-LAN circuit pack.
1
1
TN802B IP Interface Assembly
1 or more
H600-512.G1 external cable assembly
1 or more
259A connector
1
CAT5 or better cable
1
U.S. Robotics Sportster external modem, Model USR
33.6 EXT (U.S. customers only). Non-U.S. customers
must provide a modem comparable to this model
.
1
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...