Install Fiber Optic Cable Pass-Thru Kit for SCC1 (Single-Carrier) Cabinets
Administering Fiber Optic Cables
210
SI Installation and Upgrades
June 2004
Administering Fiber Optic Cables
NOTE:
You administer Fiber Optic Cables only on an Avaya Media Gateway or in a Multicarrier
Cabinet (MCC1).
When a fiber optic cable is properly labeled, it is easy to trace the desired circuit by looking at the labels
on the cross-connect, the cable itself, and the individual fibers in the cable.
Refer to
•
Fiber Link Administration Form
•
Administration commands
•
PN reliability configurations
•
Task List: Administration Details
Fiber Link Administration Form
This form administers fiber links, each of which is identified by a fiber number.
Port networks (PNs) are connected via direct fiber link connections or through a center stage switch
(CSS) to provide the interconnection of port networks required for voice/data information transfer. The
CSS is composed of "switch nodes" that can be interconnected in one or two levels to provide Port
Network Connectivity (PNC). The CSS provides circuit-switched connectivity for voice and data
communications as well as packet-switched connectivity. Fiber link administration permits an
administration of translation data associated with a switch connection (such as optical fiber, metallic
cable, or DS1CONV circuit packs and DS1 facility links between two endpoints). The two fiber
endpoints can be:
•
An expansion interface (EI) circuit pack
•
A switch node interface (SNI) circuit pack
NOTE:
Only one administrative terminal can administer fiber links at a time; others can display
fiber link information.
Administration commands
Use the following commands to administer the Fiber Link Administration form.
Action
Object
Qualifier
add
fiber-link
link number or [’next’]
change
fiber-link
link number
display
fiber-link
link number
list
fiber-link
link number
remove
fiber-link
link number
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...