Install and Connect MCC1 (Multicarrier) Cabinet
Task List: Connect AC power and ground
342
SI Installation and Upgrades
June 2004
Return to Task List
Connect Shorting Cable to J58890CE-2
Return to Task List
CAUTION:
For a cabinet with a battery charger, read the caution label on the 397C battery charger
before disconnecting batteries.
Some cabinets contain a J58890CE-2 AC Power Distribution Unit without an optional battery charger.
Install the shorting cable only when a battery charger is not installed. If you do not install the shorting
cable or a battery charger, then an alarm appears.
1
Set the circuit breakers on the power distribution unit OFF. See
Figure 94
.
2
At the rear of the cabinet, insert the shorting cable (H600-442-G1) into J11. The cable is keyed so
it can fit only 1 way.
Figure 94: Shorting Cable Installation
Temperature Sensor Cable Adapter Cables
H600-476 Adapter Cable
Usage
Group 1 (G1)
24-cell customer-provided battery
Group 3 (G3) (included with
battery cabinet)
24-cell Avaya battery
Figure notes
1
Shorting Cable (H600-442-G1) (If Battery Charger is Not Installed)
2
J11
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...