G3V4vs/R5vs/R6vs to Avaya Communication Manager
Task List: DEFINITY vs to Avaya Communication Manager
142
SI Installation and Upgrades
June 2004
Return to Task List
Provide the required tools [from
G3V4vs/R5vs/R6vs]
Return to Task List
This upgrade may require the following tools and other items:
Required hardware
Description
Quantity
Basic Control Cabinet
1
WP-91153 Power Unit
1
TN2404, Vintage 3 Processor Circuit Pack
1
1
1 The TN2404 and TN2401 circuit packs ship inside the Basic Control Cabinet.
TN2401 Network Controller/Packet Interface Circuit Pack
1
1
AHF110 TDM/LAN Bus Terminator
2
8 Mbyte Mass-Storage Translation Card (White Card)
or
16 Mbyte Mass-Storage Translation Card (White Card)
or
48 Mbyte Mass-Storage Translation Card (White Card)
1
2
2 A 16 Mbyte translation card is required for a system that uses recorded announcements or
if a DEFINITY Wireless Business System is installed.
Stiffener (Earthquake mounting only)
1
Earthquake Front Mounting Angle (Earthquake mounting only)
1
Required Tools
No.
Description
4
1
Software Release Letter
2
Avaya Communication Manager on removable media
3
Extra formatted removable media
4
Authorized wrist grounding strap
5
Documentation (book or PDF file) for the current release:
— Maintenance for Avaya DEFINITY® Server SI
— Administrator's Guide for Avaya Communication Manager
6
Your personal Single Sign-On (SSO) for RFA website authentication login.
7
SAP order number with RTUs
8
Look up hardware serial number(s).
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...