System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
SI Installation and Upgrades
241
June 2004
Disconnect TDM cables [75 XE upgrade]
Return to Task List
NOTE:
The cables and adapters will not be reused.
1
Note the position of each cable adapter.
2
Remove all of the TDM cables.
3
Remove the AHF103 TDM cable adapters.
Return to Task List
Remove the control cabinet [75 XE upgrade]
Return to Task List
To remove the control cabinet from the bottom of the port network, you must completely dismantle the
system.
!
DANGER
:
A port cabinet may weigh as much as 125 pounds and requires 2 handlers to unstack
the cabinets. If third or fourth cabinet is to be removed, remove the front door,
power supply, and circuit packs to lighten the load. Use caution to avoid injury.
1
Verify that all of the power, grounding, TDM, and connector cables have been disconnected.
2
Ensure that there is adequate space available to place each cabinet in an out-of-the-way location
as the port network is dismantled.
3
Remove the cabinet clip between each cabinet.
4
Remove each port cabinet from the stack, and put it in a safe place.
5
If the control cabinet is earthquake mounted, remove the hardware securing the cabinet to the
floor.
6
Move the existing control cabinet out of its present location. It will not be reused, so it can be
removed at this time.
Return to Task List
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...