Index
J
SI Installation and Upgrades
867
June 2004
installing system access software
,
447
,
452
installing the MDF
,
408
installing trunk cables
,
413
integrated announcement
testing
,
733
integrated channel service unit
,
651
integrated channel service unit (ICSU)
,
816
integration process
connecting ITS components
,
619
,
629
connecting ITS to the network
,
605
Intercabinet Cable Connections
System 75 XE
,
251
inter-cabinet cables
,
385
,
396
internet telephony server. See ITS.
IOLAN+ 104 terminal server
,
793
installation and administration
,
794
IP address, assigning
,
636
IP connections, testing
,
642
IP gateway, assigning
,
638
IP interface
administering Media Processor mode
,
623
connect modem
,
619
,
629
IP Trunk mode/MedPro mode
,
601
required hardware
,
617
,
627
IP interface (TN802B), installing in IP trunk mode
,
627
,
629
,
630
,
631
,
633
,
634
,
635
,
636
,
638
,
641
,
642
IP interface (TN802B), installing in MedPro mode
,
616
,
618
,
619
,
620
,
621
,
623
,
625
IP interface (TN802B), upgrading to TN2302AP IP Media
Processor
,
613
,
614
,
615
IP interface assembly
,
601
IP Trunk mode
,
626
test external connection to LAN
,
642
test onboard LAN connections
,
642
IP interface LAN connections
,
642
IP Media Processor
,
601
,
607
installing
,
602
,
604
software limits
,
602
test external connection to LAN
,
610
IP Media Processor, connecting
,
610
IP Media Processor, installing
,
606
IP Media Processor, upgrading from IP interface
assembly
,
613
,
614
,
615
IP Media Processor, upgrading to
,
611
,
612
IP network connection, testing
,
737
IP services
,
803
IP Solutions
,
601
Avaya R300 Remote Office Communicator
,
601
onsite prerequisites
,
603
TN2302AP
,
601
TN802/B
,
601
IP Solutions, inspecting
,
603
IP Trunk mode
,
601
,
626
assign IP address
,
636
change Mu-Law to A-Law
,
635
IP trunk mode, administering
,
633
IP trunk mode, installing
,
627
,
629
,
630
,
631
,
633
,
634
,
635
,
636
,
638
,
641
,
642
ISDN
,
760
BRI testing
,
735
PRI interface
,
760
ISDN adapters
,
828
ISDN BRI
,
570
fanout of multipoint installations
,
573
,
576
terminating resistor
,
570
ISDN BRI pinouts
,
774
ISDN BRI, installing
,
576
,
577
ISDN converters
,
828
for multi-carrier cabinets
,
830
for single-carrier cabinets
,
828
PRI-to-BRI
,
829
,
830
PRI-to-DASS
,
828
,
830
PRI-to-DPNSS
,
828
,
830
ISDN PRI trunks
,
666
,
667
,
668
ISDN-PRI
,
848
ISDN-PRI D-Channels, status
,
848
Italy, country code
,
471
ITS
changing network services
,
641
connecting components
,
619
,
629
ITW Linx enhanced protector
,
529
ITW Linx enhanced protector, installing
,
530
J
J58890CE-2 power distribution unit
,
342
J58890CG DC power distribution unit
,
374
J58890H port cabinet
,
365
,
366
J58890L control cabinet
,
365
,
366
,
367
J58890L-1 L5 Enhanced Control Cabinet
,
310
J58890M control cabinet
,
366
J58890N expansion control cabinet
,
365
,
366
,
367
J58890R DC power cabinet
,
370
,
374
,
382
Japan, country code
,
471
jumper fields, port cabinet
,
390
jumper wires, connecting trunk pairs
,
433
jumpers, installing and administering
,
429
K
KS-22911 power supply
,
832
KS-22911L2 power supply
,
835
L
label cables
,
113
,
149
,
295
Labeling Cables
System 75 XE
,
238
labels
fiber optic cable
,
768
on power supply, warning
,
364
labels, control carrier cable
,
431
labels, equipment room cabling
,
412
labels, MDF
,
409
LAN
testing external connection
,
625
LAN connections, testing
,
642
large battery holdover
,
341
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...