Upgrades to Avaya Commnication Manager Made Easy
Before you start
36
SI Installation and Upgrades
June 2004
When to use the TN2401 versus the
TN2401/2400 sandwich pack
Field upgrades normally require the TN2401/TN2400 Network Control sandwich pack, Comcode
848486809, but there are exceptions to this rule!
NOTE:
IMPORTANT NOTE:
MCC1 SI Processor Carrier J58890AH-2 List 12 (which replaces List 5) does require the
TN2401/TN2400 Network Control sandwich pack, Comcode 848486809. This carrier has been
identified in older DEFINITY documentation as not requiring the sandwich pack!
Only the carriers and backplanes listed in this table use the TN2401 NetCon circuit pack, Comcode
108516675:
DEFINITY Carrier /
Backplane
Equipment
Notes
SCC1 Processor Cabinet
J58890L-2 List 25
This replaces List 10
SCC1 Processor Cabinet
(Survivable Remote)
J58890L-2 List 31
This replaces List 30
SCC1 Processor Cabinet (Knock
Down)
J58890L-2 List 52
This replaces List 51
Backplane for the J58890L-2 List
25, List 31, and List 52 Cabinets
PWJ58890AL-1 List 3
This backplane replaces List 2
Backplane for the J58890L-2 List
25, List 31, and List 52 Cabinets
PWJ58890AL-1 List 3
with a label on the left-
rear of the SCC1
identifying the quick-fix
backplane.
This backplane, a List 2 with a
CRW1, Series 2, bridge card
installed, is electrically equivalent to
the PWJ58890AL-1,L3 backplane.
This backplane replaces List 2.
SCC1 Duplication Processor
Cabinet
J58890M-2 List 15
This replaces List 7
SCC1 Duplication Processor
Cabinet (Knock Down)
J58890M-2 List 52
This replaces List 51
Backplane for the J58890M-2
List 15 and List 52 Cabinets
PWJ58890AM-1 List 3
This backplane replaces List 2
MCC1 SI Processor Carrier
J58890AH-2 List 13
This replaces List 10
MCC1 SI Processor Carrier
(Knock Down)
J58890AH-2 List 55
This replaces List 54
Backplane for the J58890AH-2
List 13 and List 55 Cabinets
PWJ58906AA-1 List 4
This backplane replaces List 3
MCC1 SI Duplication Processor
Carrier
J58890AJ-2 List 12
This replaces List 9
MCC1 SI Duplication Processor
Carrier (Knock Down)
J58890AJ-2 List 55
This replaces List 54
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...