System 75 Small-Cabinet to R8si (Blowback)
Task List: System 75 Small Cabinet to R8si
292
SI Installation and Upgrades
June 2004
Auxiliary lead appearances at AUX connector
Color
Pin number
AUX connector outputs
W-BL
BL-W
26
1
Major
(Note 1)
W-O
O-W
27
2
Minor
(Note 1)
W-G
G-W
28
3
GND
W-BR
BR-W
29
4
GND
W-S
S-W
30
5
GND
R-BL
BL-R
31
6
GND
R-O
O-R
32
7
GND
R-G
G-R
33
8
N/C
R-BR
BR-R
34
9
N/C
R-S
S-R
35
10
N/C
BK-BL
BL-BK
36
11
-48
GND
Emergency
transfer
relay
power
BK-O
O-BK
37
12
-48
GND
BK-G
G-BK
38
13
-48
GND
BK-BR
BR-BK
39
14
-48
GND
BK-S
S-BK
40
15
-48
GND
Y-BL
BL-Y
41
16
-48
GND
Y-O
O-Y
42
17
-48
GND
Y-G
G-Y
43
18
N/C
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...