System 75 Small-Cabinet to R8si (Blowback)
Task List: System 75 Small Cabinet to R8si
288
SI Installation and Upgrades
June 2004
Notes:
1
To provide enough port slots, may be ordered separately for upgrade to DC-powered R7si.
2
One with standard-reliability, two with critical reliability.
3
A 4 Mbyte translation card is required for a system that uses recorded announcements. A 10
Mbyte card is required if a DEFINITY Wireless Business System is installed.
4
For upgrade, reused from the small R1V3 cabinet (if present).
5
Shipped loose with the upgrade equipment. Extends TDM/LAN bus to reused port carrier.
6
Required in a port slot of a critical-reliability R8si P with the optional packet bus. Optional for use
with digital trunk testing.
Return to Task List
Provide the required tools [75 small upgrade]
Return to Task List
The following tools and items may be required during the upgrade:
•
Flash maintenance kit (MTCE 00037), acquired from MSL (control-carrier replacement only)
•
High-intensity drop light or flashlight
•
3/8-inch flat-blade screwdriver with a 10-inch shank (minimum)
•
5/16-inch and 1/4-inch sockets with a ratchet and 10-inch extension
•
Power screwdriver (optional)
•
Pliers (for cabinet replacement, long-nose pliers to disconnect grounding straps and straighten
backplane pins)
•
Static-proof or original circuit-pack packaging for transporting circuit packs
•
Labels for labeling the cables attached to the rear of cabinets and port circuit pack
•
Receptacle for holding approximately 100 self-tapping screws
•
Twelve spare #12 and #10 self-tapping screws
•
Four spare carrier grounding straps
Required hardware, Small Sytem 75 upgrade to multi-carrier R8si
Description
Equipment
Quantity
Processor Port Network
6300-159
1
DC-Powered Port Carrier
63155
1 (Note 1)
2 Mbyte Mass-Storage Translation Card (White Card)
or
4 Mbyte Mass-Storage Translation Card (White Card)
or
10 Mbyte Mass-Storage Translation Card (White Card)
601817448
or
601817422
or
601817430
1 or 2 (Notes 2 and
3)
Port Carrier
J58890BB
1 (Note 4)
WP-91716 L6 TDM/LAN Cable
J58890A L20
1 (Note 5)
TN771DP Maintenance (optional)
106689516
1 (Note 6)
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...