Install and Connect MCC1 (Multicarrier) Cabinet
Task List: Connect AC power and ground
SI Installation and Upgrades
341
June 2004
Connect Large Battery Holdover
Return to Task List
When using large battery holdover, 1 battery cabinet is required for every system cabinet requiring
holdover. The 24-cell battery cabinet must have a float voltage of 54.2 VDC.
1
Connect the -48 VDC cable to the large battery connector. See
Figure 93, Power Distribution Unit
(J58890CH),
on page 341.
2
Connect the -48 VDC RETURN cable to the ground terminal block.
3
Connect the temperature sensor cable, from the battery cabinet, to J20.
NOTE:
An adapter cable may be required when connecting the temperature sensor cable to the
J58890CH unit. See
Temperature Sensor Cable Adapter Cables
.
Figure 93: Power Distribution Unit (J58890CH)
Figure notes
1
Connect small battery holdover
cable (or temperature sensor cable
from large battery cabinet) to J20
2
Carrier Circuit Breakers
3
Ground Terminal Block
4
Connect -48 VDC Return - 1
AWG (50 mm
2
) red cable here.
5
Connect -48 VDC - 1 AWG (50 mm
2
) black
cable
6
1 AWG (50 mm
2
) 50 ft (15.2 m) cable to large
battery cabinet. For cables greater than 50 ft
(15.2 m), contact your Avaya representative.
7
Ground Terminal Block
8
To AC load center or approved single-point
ground block
Exter
nal Alar
ms
-4
8V
D
C
R
etu
rn
Ca
rrie
r
B
A
C
D
E
F
/G
R
em
ote
Po
w
er
-4
8V
DC
B
atte
rie
s
pcdf010 KLC 020599
1
2
3
4
5
6
7
8
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...