G3iV4 to Avaya Communication Manager
Task List: G3iV4 to Avaya Communication Manager
70
SI Installation and Upgrades
June 2004
Verify the required hardware [G3V4 to from
R5/R6/R7/R8si]
Return to Task List
The equipment in the table below must be:
•
Acquired from local Material Stocking Location (MSL) as part of the upgrade kit
•
Delivered to the installation site before the upgrade begins
The TSC cannot source equipment for you.
To place a claim for missing equipment as part of the Streamlined Implementation process, call 1-800-
772-5409 and respond to the call prompter, or call the number provided by your Avaya representative.
Return to Task List
Table 2: Required Hardware
Description
Quantity
TN2404 Processor Circuit Pack
1
TN2401 or
TN2401/TN2400 NetPkt Circuit Pack
1
1 See
When to use the TN2401 versus the TN2401/TN2400 sandwich pack
to
identify backplanes that use the TN2401 circuit pack.
1
Translations Card:
2
8 Mbyte Mass-Storage Translation Card (White Card)
or
16 Mbyte Mass-Storage Translation Card (White Card)
or
48 Mbyte Mass-Storage Translation Card (White Card)
2 16 Mbyte translation card is required for a system that uses recorded
announcements or if a DEFINITY Wireless Business System is installed.
1
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...