Install and Connect MCC1 (Multicarrier) Cabinet
Connect AC Power and Ground
334
SI Installation and Upgrades
June 2004
Connect AC Power and Ground
Return to Task List
CAUTION:
The equipment room AC power and ground wiring must be performed by a qualified
electrician. Refer to the Hardware Guide for Avaya Communication Manager (555-245-
207) for site requirement information.
CAUTION:
The power circuit must be dedicated to the system and must not be shared with other
equipment and must not be controlled by a wall switch. The AC receptacle should not be
located under the MDF.
CAUTION:
System grounding must comply with the general rules for grounding contained in Article
250 of the National Electrical Code (NEC), National Fire Protection Agency (NFPA) 70,
or the applicable electric code in the country containing the equipment. For more
information, refer to
Approved Grounds
.
For information about connecting AC power and ground, see:
•
Power Requirements
•
Power Supply Sources (J58890CE-1, J58890CE-2, and J58890CH-1)
•
Grounding an AC-Powered System (J58890CE)
•
Connect Mixed AC/DC Power and Ground
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...