Install Telecommunications Cabling
Layout
428
SI Installation and Upgrades
June 2004
One 258A/BR2580A adapter is required for each 25-pair station cable containing 4-pair station circuits.
One 356A adapter is required for each 25-pair station cable containing 3-pair station circuits. Hardware
requirements are the same as for the equipment room.
Sizing 4-Pair Station Cables
Use the scale of the floor plan to determine the approximate length of the station cables required per the
standard SYSTIMAX wiring concepts.
Sizing 25-Pair and Multiple 25-Pair Station
Cables
Use the scale of the floor plan to determine the approximate length of each 25-pair station cable. The
cables must be selected and properly sized to make maximum use of the hardware at the equipment room
or satellite location.
Use 25-pair B25A cables to connect adapters directly to the MDF or satellite location. Staggered-finger
cables, equipped with factory-installed 25-pair connectors at both ends, should be used when multiple 25-
pair cables are used between the equipment room or satellite location and the adapters. B25A cables are
required at the equipment room or satellite location to connect the staggered-finger cables to the 110-type
terminal blocks.
Use the following information to determine the cable size (cable pairs) required for either 3-pair or 4-pair
circuits. Note the length and size on the floor plan to aid in the ordering and installation of the station
cables.
3-Pair Station Cable Circuits
To determine the size of station cables containing 3-pair circuits, multiply the number of 3-pair circuits
required at the satellite location by 3.5. Then, using the minimum size cable requirement, round up the
cable size requirement to the next highest available cable bundle size. This will provide additional pairs
for growth and compensate for every twenty-fifth pair in a cable that is not used.
4-Pair Station Cable Circuits
To determine the size of station cables containing 4-pair circuits, find out how many information outlets
are served by the equipment room MDF or satellite location MDF. Multiply the number of information
outlets by 4. Then, using the minimum size cable requirement, round up the cable size requirement to the
next highest available cable bundle size.
NOTE:
This formula may not compensate for the unused twenty-fifth pair in all cases. If not, it
must be allowed for.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...