System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
SI Installation and Upgrades
277
June 2004
Test single-carrier cabinet systems
1
Check System Status for Each Cabinet
2
Check Circuit Pack Configuration
3
Test Time Division Multiplexing Bus in Processor Port Network
4
Test Tone-Clock Boards
5
Test Expansion Interface Circuit Packs
6
Test Time Division Multiplexing Bus for Each Expansion Port Network
7
Test Tone-Clock for Each Expansion Port Network
8
Test Tone-Clock Interchange for Each Expansion Port Network
9
Test Expansion Interface Exchange for Each Expansion Port Network
10
Check Circuit Pack Configuration
11
Save Translations, if Required
Test multi-carrier cabinet systems
1
Check System Status for Each Cabinet
2
Check Circuit Pack Configuration
3
Test TDM Bus in PPN
4
Test Tone-Clock Circuit Packs
5
Test SPE Duplication Memory Shadowing Link
6
Test Duplicated Switch Processing
7
Element Interchange
8
Test Expansion Interface Circuit Packs
9
Test TDM for each EPN
10
Test Tone-Clock for each EPN
11
Test Tone-Clock Interchange for each EPN
12
Test Expansion Interface Exchange for Each EPN
13
Check Circuit Pack Configuration Again
14
System Test Completion
15
LED Indicators
Test telephones and other equipment
1
Make Test Calls
2
Test 302C Attendant Console
3
Test External Ringing
4
Test Queue Warning Indicator
5
Test Integrated Announcement
6
Test Music-on-Hold
7
Test Emergency Transfer
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...