Install Fiber Optic Cable Pass-Thru Kit for MCC1 (Multicarrier) Cabinets
Install the fiber optic cable pass-thru kit (MCC1)
SI Installation and Upgrades
177
June 2004
Install Fiber Optic Cable Pass-Thru Kit
for MCC1 (Multicarrier) Cabinets
This section details the installation of the fiber optic pass-thru kit for multi-carrier cabinets (MCC1) only.
This kit provides the equipment necessary to install the fiber optic connectors and associated cabling.
Install the fiber optic cable pass-thru kit (MCC1)
Use this task list to install the fiber optic cable in the MCC1 (multicarrier) cabinet:
1
Prepare the cabinet
2
Install the Pass-Thru Kit
3
Test the Installation
LASER Product
CLASS 1 LASER PRODUCT
IEC 825 1993
The Avaya Media Gateway may contain a Class 1 LASER device if single-mode fiber optic cable is
connected to a remote Expansion Port Network (EPN). The LASER device operates within the following
parameters:
•
Maximum Power Output: -5dBm
•
Wavelength: 1310 nm
•
Mode Field Diameter: 8.8 microns
CAUTION:
Use of controls or adjustments or performance of procedures other than those specified
herein may result in hazardous radiation exposure.
Contact your Avaya representative for more information.
Prepare the cabinet
Return to Task List
1
Verify the equipment received.
See
Fiber pass-thru kit equipment
. Actual equipment may vary in appearance and may ship in
separate packages.
2
Open the front door.
NOTE:
Administration may be required before removing the circuit pack in the following step.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...