Install Telecommunications Cabling
Station Circuit Distribution from Equipment Room
422
SI Installation and Upgrades
June 2004
Figure 147: 4-Pair Circuit Distribution and Connectivity
Figure 148: 4-Pair Run to Equipment Room or Satellite Location
Figure notes
1
Part of Main Distribution Frame (MDF)
2
3-Pair Connecting Blocks
3
4-Pair Connecting Blocks
4
Purple Field
5
Blue Field
6
Patch Cord or Cross-Connect Jumpers
7
To System Cabinet (Three-Pair
Modularity)
8
B25A Cable
9
Connectorized (Staggered Finger) Multiple
25-Pair Cable
10
258A or BR2580A Adapter
11
Information Outlet
12
4-Pair Circuit
13
DIW Station Cable (D-Inside Wire)
Figure notes
1
Station Side of MDF or Satellite
Location
2
4-Pair Circuit
3
Blue Field
4
DIW Station Cable (D-Inside Wire)
5
Information Outlet
2
3
8
8
4
9
7
6
1
12
12
11
10
13
r764797a CJL 031396
3
4
1
5
2
2
r764798a CJL 030796
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...