Install Additional Hardware
Task List: Add Packet Bus Support
590
SI Installation and Upgrades
June 2004
Power Up System (Packet Bus Support)
Return to Task List
1
At the EPN, set the main circuit breaker to ON.
2
At the PPN, set the main circuit breaker to ON.
3
The system performs a level 4 reboot, loading the system translations from the translation cards.
Rebooting takes about 10 minutes.
4
After all trouble is cleared, verify the EMERGENCY TRANSFER CONTROL switch is set to
AUTO. This restores the system to the normal mode.
Return to Task List
Deliver or install the License File (Packet Bus Support)
Return to Task List
CAUTION:
This procedure must be done immediately after you upgrade the software. If the license
file is not installed within 10 days, the switch enters a No-License mode and shuts down
all call processing.
New Duplicated G3r installations only
1
Retrieve the RFA License File with both serial numbers from the RFA Application.
2
Type
set time
and press Enter.
Ensure that the system date and time are set correctly.
3
Use one of these installation methods:
—
Direct connection between the switch and RFA
—
No connection between the switch and RFA
4
Type
save translation
and press Enter.
After the translations have been copied (about 10 minutes), the system returns an error code,
which must be a zero; otherwise, the translations are not copied.
Circuit Pack Locations for Packet Bus in PPN
Circuit
Pack
Carrier
Quantity
Slot
TN570D
Control Carrier A
1 or 2
1
1 Quantity of this pack should equal the number of EPNs.
EXPN INTFC/1 and /2
Control Carrier B (if duplicated)
1 or 2
EXPN INTFC/1 and /2
TN771C
Control Carrier A
1
2
2 Required for critical-reliability EPNs and PPN. Optional for digital trunk testing in high-
reliability PPN.
Any available port slot
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...