System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
262
SI Installation and Upgrades
June 2004
Figure 61: Fiber-Optic Connections PPN to EPN (standard reliability remote cabinets)
Return to Task List
Connecting Critical Reliability adjacent
cabinets
When a critical-reliability PPN and EPN are collocated, two fiber-optic cables (FL2P-P-XX) and four
lightwave transceivers (9823-type) are required to connect the EPN.
1
Behind control cabinet A of the single-carrier PPN (see
Figure 62, Critical-Reliability Release 8si
with Two Port Networks,
on page 264 and
Figure 63, Critical Reliability fiber optic connections
(adjacent cabinets),
on page 265):
— Install a 9823-type lightwave transceiver on the connector at slot 1A01.
— Connect one end of a fiber-optic cable to the 9823-type lightwave transceiver at slot 1A01.
— Route the fiber-optic cable from the 9823-type lightwave transceiver to the cabinet’s cable
tray and downward out of the cabinet to the EPN stack.
— Delicately attach the fiber-optic cable (with cable ties) to the wall of the cable tray at the
built-in cable-tie positions.
1
2
TX
RX
2
1
1
1
2
2
TX
RX
PPN
OPTIC
CABLES
CROSS-CONNECT FACILITY
OPTIC
CABLES
100A
LIU
100A
LIU
CABINET A
SLOT 1A01
CABINET A
SLOT 2A01
LIGHTWAVE
LIGHTWAVE
TRANSCEIVER
TRANSCEIVER
FL2P-P-XX
9823-TYPE
FL2P-P-XX
9823-TYPE
EPN 1
FIBER- FIBER-
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...