Connecting and Handling Fiber Optic Cables
LASER Product
SI Installation and Upgrades
763
June 2004
Connecting and Handling Fiber Optic
Cables
Signals between the cabinets composing the system are carried by fiber optic cables. To accomplish this,
the electronic signals at the connectors on the back of a cabinet must be converted into optical signals,
and optical signals from another cabinet must be converted back into electronic signals. Opto-electronic
devices (lightwave transceivers) provide this interface.
LASER Product
The Avaya Media Gateway may contain a Class 1 LASER device if single-mode fiber optic cable is
connected to a remote Expansion Port Network (EPN). The LASER device operates within the following
parameters:
•
Maximum Power Output: -5 dBm
•
Wavelength: 1310 nm
•
Mode Field Diameter: 8.8 micrometers
CLASS 1 LASER PRODUCT
IEC 825 1993
CAUTION:
Use of controls or adjustments or performance of procedures other than those specified
herein may result in hazardous radiation exposure.
Contact your Avaya representative for more information.
Detailed Information
See
Optical Cross-Connect Hardware
on page 763 for hardware details.
See
Cleaning Fiber Optic Cables
on page 768 for cleaning instructions.
Optical Cross-Connect Hardware
Optical cross-connects consist of Lightguide Interconnect Units (LIUs) with lightguide troughs in
between them.
Figure 300, Typical Optical Lightguide Interconnect Unit,
on page 764 shows a typical
LIU. One LIU terminates the incoming cables and the other terminates the outgoing cables. A fiber optic
patch cord or jumper is used to connect the circuits. Circuits can be rerouted the same as on 110-type
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...