UPS Installation for SCC1 EPN A-Carrier Cabinet
Task List: Install UPS
SI Installation and Upgrades
791
June 2004
8
Type
add eda-external-device-alrm
XXminor
and press Enter.
9
Type XXminor in the
Port
field.
10
Type minor in the
Alarm Type
field.
11
Type UPS A in the
Alt Name
field.
12
Type A Level UPS is on Electronic Bypass in the
Description
field.
13
Enter data in the remaining fields based on your installation requirements.
14
When done, press Enter.
Return to Task List
Load-test and Verify Alarms
Return to Task List
CAUTION:
Do not remove or unplug the input cord when the UPS is turned on. This removes the
safety ground from the UPS and the equipment connected to the UPS.
15
With the Avaya Media Gateway on the UPS, find the (dedicated) circuit breaker that feeds power
to the receptacle that the UPS is plugged into.
16
Turn the breaker off. At that time, the UPS sounds an alarm, and the RED LED (ON BATTERY)
and 3 GREEN LEDs (L1, L2, and L3) above the GREEN LED (OUTPUT) light up.
17
If the EDA is turned on, type
test eda-external-device-alrm
physical
XXmajor
and press Enter.
Verify that the test fails.
18
If the EDA is turned off, type
display alarms
and press Enter.
19
Type your requirements in the various fields of the Alarm Report, then press Enter.
20
Verify that you have a major alarm on EXT-DEV for Port XXmajor. You do not need to verify a
minor alarm (UPS on Electronic Bypass).
21
If a U.S. installation, call the Product Performance and Analysis organization on 800-242-2121,
press 0 (zero), and enter extension 85284. Verify that the EXT-DEV XX major alarm was reported
to them.
22
Ask the Product Performance and Analysis organization to establish a data base for the
installation location (IL). This defines the major and minor external alarms.
The Product Performance and Analysis organization enters the major alarm on EXT DEV XX as
“Loss of Commercial Power, UPS on Battery” and the minor alarm on EXT DEV XX is “UPS is
on Electronic Bypass.”
Return to Task List
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...