Bring the System Online
Task List: Administer the System
474
SI Installation and Upgrades
June 2004
3
Press Enter.
Figure 177: Typical Daylight Savings Time Rules
Return to Task List
Set Date and Time
Return to Task List
1
Type
set time
and press Enter.
2
Verify the screen displays the Date and Time screen. See
Figure 178, Typical Date and Time
Screen,
on page 475. The cursor is positioned on the
Day of the Week:
field.
3
Type the day of the week in English (Sunday through Saturday) and press Tab to move to next
field. See
Table 17, English Day of the Week Names,
on page 475 for English day of the week
names.
4
The cursor is positioned on the
Month:
field. Type the current month in English (January
through December). See
Table 18, English Month Names,
on page 475 for English month names.
After the month is entered, press Tab to move to next field.
5
The cursor is positioned on the
Day of the Month:
field. Type the day of month (1 through
31) and press Tab to move to the next field.
6
The cursor is positioned on the
Year:
field. Type the current year and press Tab to move to the
next field.
7
The cursor is positioned on the
Hour:
field. Type the current hour for a 24-hour clock. See
Table
19, Conversion to 24-Hour Clock,
on page 476. Press Tab to move to the next field.
8
The cursor is positioned on the
Minute:
field. Type current minute (0 through 59). Seconds
cannot be set.
9
Type standard or daylight savings in the
Type
field.
10
Type the rule (number) in the
Daylight Savings Rule
field.
11
Press Enter when the information is correct
.
DAYLIGHT SAVINGS RULES
Rule Change Day Month
___
Date Time
____
Increment
0:
No Daylight Savings
1:
Start: first Sunday___ on or after April____ 1 at _3:00 01:00
Stop: first Sunday___ on or after October_ 25 at _3:00
2:
Start: first Sunday___ on or after April___ 1 at _4:00 01:00
Stop: first Sunday___ on or after October_ 25 at _3:00
3:
Start: first _________ on or after ________ __ at __:__
Stop: first _________ on or after ________ __ at __:__
4:
Start: first _________ on or after ________ __ at __:__
Stop: first _________ on or after ________ __ at __:__
5:
Start: first _________ on or after ________ __ at __:__
Stop: first _________ on or after ________ __ at __:__
6:
Start: first _________ on or after ________ __ at __:__
Stop: first _________ on or after ________ __ at __:__
7:
Start: first _________ on or after ________ __ at __:__
Stop: first _________ on or after ________ __ at __:__
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...