R5/R6/R7/R8si to Avaya Communication Manager
Task List: R5/R6/R7/R8si to Avaya Communication Manager
SI Installation and Upgrades
119
June 2004
1
Remove the following equipment:
— Translation card from the TN777B or TN794
— TN790/B processor circuit pack
— TN778 packet control circuit pack
— TN777B network control or TN794, TN794/TN2400 NetPkt circuit packs
2
Store each component separately in anti-static packing material.
NOTE:
Keep original translation card nearby.
Return to Task List
Remove TN765 circuit pack [from
R5/R6/R7/R8si]
Return to Task List
1
Remove the TN765 processor interface circuit pack if no bx.25 links were administered and the
customer does not plan on using them in the future.
Replace TN772 duplication interfaces with the
TN792 duplication interfaces (R6si or earlier)
[from R5/R6/R7/R8si]
Return to Task List
1
Remove the TN772 Duplication Interface circuit packs and place them in antistatic packing
material.
Leave the existing duplication cables connected to the backplane. The fiber optic cable
connecting the new TN792 Duplication Interface circuit packs does not replace these cables.
2
Insert the TN792 Duplication Interface circuit packs into the slots labeled DUPN INTFC.
3
If the carrier is located in a Multicarrier Cabinet (MCC1), attach the 14-in. fiber optic cable to the
faceplates of the installed TN792 Duplication Interface circuit packs (see
Figure 1, Fiber optic
cable connecting the two TN792 duplication interface circuit packs (multicarrier cabinet only),
on
page 120).
or
If the carrier is in a Single-Carrier Cabinet (SCC1), then attach the 10-ft fiber optic cable to the
faceplates of the installed TN792 Duplication Interface circuit packst.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...