System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
SI Installation and Upgrades
257
June 2004
Figure 57: ICC Pin-Field Blocks on J58890H Port Cabinet
Return to Task List
Interconnect Port Networks - Dual cabinet (EPN) upgrade only [75 XE upgrade]
Return to Task List
NOTE:
These procedures are for an EPN upgrade only.
You will be making fiber-optic connections between cabinets.
Select the procedure that best fits your location and reliability level from the table below:
5.00 4.00
6.00
0
3 2 1
00
3.00
24
2.00
1.00 0.00
ICCB
ICCA
Reliability level
Adjacent cabinets
Remote cabinets
Standard/High
Connecting standard or high reliability
adjacent cabinets
Connecting standard or high reliability
remote cabinets
Critical
Connecting Critical Reliability adjacent
cabinets
Connecting critical reliability remote
cabinets
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...