Install Telecommunications Cabling
Station Circuit Distribution from Equipment Room
SI Installation and Upgrades
423
June 2004
Figure 149: 4-Pair Run to Equipment Room or Satellite Location
8
7
1
9
10
11
r758532a CJL 031196
2
4
3
6
5
Figure notes
1
Part of MDF
2
3-Pair Connecting Blocks
3
4-Pair Connecting Blocks
4
Purple Field
5
Patch Cord or Cross-Connect Jumpers
6
Blue Field
7
To System Cabinet (3 pair modularity)
8
A25D Cable
9
258A or BR2580A Adapter
10
Information Outlet
11
4-Pair Circuit (DIW station cable (D-
Inside Wire))
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...