Adjuncts and Peripherals
.Install ISDN converters and adapters
828
SI Installation and Upgrades
June 2004
.
Install ISDN converters and adapters
This section provides information on ISDN converters and adapters that are sometimes necessary when
connecting to coaxial facilities in either a multicarrier cabinet or a single carrier cabinet.
Connections include:
•
Integated Services Data Network Primary Rate Interface (ISDN-PRI) to Direct Access Secondary
Storage (DASS)
•
PRI to Digital Private Network Signaling System (DPNSS)
•
PRI to ISDN Basic Rate Interface (ISDN-BRI)
Converter circuit packs known as common channel signaling converter (CCSC), types 1 and 2.
Converters for single-carrier cabinets
PRI-to-DASS and PRI-to-DPNSS converters
Figure 320
shows typical connections from the CCSC-1 PRI-to-DASS converter or the CCSC-2 PRI-to-
DPNSS converters to the coaxial facility.
Figure 320: Typical DASS or DPNSS converter cabling
Figure notes
1
To TN464GP DS1 circuit pack and either a
CSCC-1 PRI-to-DASS converter or a CSCC-2
PRI-to-DPNSS converter circuit pack
2
Communication Manager administration PC
3
RS-232 cable to front of PRI converter circuit
pack
4
888B coaxial converter
5
Coaxial connection to 2-Mbps
facility
6
Coaxial cable from PRI
converter circuit pack to coaxial
converter
0001 0 RBP 051396
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...