Test the System
LED Indicators
496
SI Installation and Upgrades
June 2004
4
If Multi-Carrier Cabinet (MCC1), type
status system cabinet number <1-44>
and press Enter.
or
If Single-Carrier Cabinet (SCC1), type
status system all-cabinets
and press Enter.
A screen similar to
Figure 191, Sample of System Status after Expansion Link is Set,
on page 496
is displayed.
5
Verify the
MODE
of the expansion links have changed.
6
If any problems are indicated, check the TDM cables and the inter-cabinet cables (ICC) in the
associated Expansion Port Network (EPN).
Figure 190: Sample of System Status before Expansion Link is Set
Figure 191: Sample of System Status after Expansion Link is Set
Return to Task List
status system all-cabinets
SYSTEM STATUS CABINET 1
EMERGENCY SELECT SERVICE CABINET
TRANSFER SWITCH EXP-LINK STATE MODE TYPE
1A unavail 01A01-02A01 in standby ESCC
1B auto-on 01B01-02B02 in active
-
-
Command successfully completed
Command:
status system all-cabinets
SYSTEM STATUS CABINET 1
EMERGENCY SELECT SERVICE CABINET
TRANSFER SWITCH EXP-LINK STATE MODE TYPE
1A auto-on 01A01-02A01 in active ESCC
1B auto-on 01B01-02B02 in standby
Command successfully completed
Command:
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...