Install and Connect MCC1 (Multicarrier) Cabinet
Task List: Install and Connect MCC1
328
SI Installation and Upgrades
June 2004
13
Connect External Alarm Cable
14
Check Commercial Power and Connect AC Power
15
Verify Fiber Optic Duplication Interface Cabling (TN792 port networks)
16
Connect Fiber Optic Interconnect Cabling
Check Customer’s Order
Return to Task List
1
Check the customer’s order and the shipping packing lists to confirm all equipment is present.
2
Check the system adjuncts for damage and report all damage according to local shipping
instructions.
3
If any equipment is missing, report the information to your Avaya representative.
Unpack and Inspect Cabinets
Return to Task List
CAUTION:
A cabinet may weigh as much as 800 lb (363 kg) and may be top heavy. Use extreme
caution.
1
Check the status of the SHOCKWATCH and/or TILTWATCH indicators on the container. If the
container has been shaken or tilted beyond specifications, the indicators are red, indicating
potential damage. Report any damage according to local shipping instructions.
!
DANGER
:
Take care to avoid injury while cutting and removing the 2 metal bands.
2
Unpack the cabinet and remove all packing material.
3
Move the cabinets into their proper positions.
4
Do not adjust the leveling feet at this time.
Return to Task List
Unpack and Inspect Auxiliary Cabinet
Return to Task List
The Auxiliary cabinet is normally positioned adjacent to the PPN cabinet or the EPN cabinet, if provided.
1
Check the status of the SHOCKWATCH and/or TILTWATCH indicators on the container. If the
container has been shaken or tilted beyond specifications, the indicators are red, indicating
potential damage. Report any damage according to local shipping instructions.
!
DANGER
:
Take care to avoid injury while cutting and removing the 2 metal bands.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...