Install and Administer Trunks
Add DS1 Tie and OPS Trunks
672
SI Installation and Upgrades
June 2004
Disable Scheduled Maintenance and Alarm
Origination
to INADS (DS1 Tie and OPS Trunks)
Return to Task List
1
To prevent scheduled daily maintenance from interfering with the update or upgrade, type
change system-parameters maintenance
and press Enter.
2
If scheduled maintenance:
— has begun: set the
Stop Time
field to 1 minute after the current time.
— has not begun: set the
Start Time
field to at least 8 hours after the upgrade starts.
CAUTION:
If you do not disable Alarm Origination, the system may generate alarms, resulting in
unnecessary trouble tickets.
3
Type neither in the
Alarm Origination to OSS Numbers
field and press Enter.
Return to Task List
Save Translations (DS1 Tie and OPS Trunks)
Return to Task List
1
If the system is high or critical reliability, type
status system 1
and press Enter to verify that the
system is in the
active/standby
mode.
2
Type
save translation
and press Enter. This instructs the system to take all translation
information in memory and write it to the translation card or removable media.
3
If the system contains a TN750/B Announcement circuit pack, type
display announcements
and
press Enter. If administered recorded announcements are listed, type
list configuration
software-version
press Enter. Check Page 2 of this form to see when the announcements were
last saved. To save the current announcements, type
save announcements
and press Enter.
Shut Down DEFINITY LAN Gateway System
(DS1 Tie and OPS Trunks)
Return to Task List
!
WARNING:
Neglecting to shut down the LAN Gateway assembly before powering down the system
cabinet can damage the LAN Gateway disk.
1
Log onto the DEFINITY LAN Gateway.
2
From the main menu, click Maintenance > Reset System > Shutdown.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...