Install and Wire Telephones
Task List: Attendant Console Procedures
518
SI Installation and Upgrades
June 2004
Hard-Wire Bridging
Analog type hard-wire bridging is not allowed for four-wire (only) DCP endpoints. Hard-wire bridging
provides no way of combining the digital output of two bridged DCP sets. Also, a bridged endpoint
causes degradation of the DCP signal.
CAUTION:
Bridging or paralleling these endpoints can cause electrical damage to the consoles or
cause the circuit pack to remove power from the consoles.
Dual Wiring of Two-Wire and Four-Wire
Endpoints
Do not simultaneously wire a two-wire and four-wire endpoint to the same equipment location in an
MDF. The Avaya Media Server or Gateway uses separate circuit packs to interface two- and four-wire
endpoints.
Install the Attendant Console
Return to Task List
1
Install the Attendant Console and connect the modular cord to the information outlet.
2
Install labels per the Attendant Console form and the Display Module form assignments.
3
Install a Digital Line circuit pack in the assigned carrier slot (if an additional circuit pack is
required).
4
Administer the forms listed in “Attendant Console” in Administrator’s Guide for Avaya
Communication Manager (555-233-506).
Figure 200: 302C1 Console
Return to Task List
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...