Contents
SI Installation and Upgrades
7
June 2004
G3iV4 to Avaya Communication Manager
63
• Introduction
63
References
63
When to use the TN2401 versus the TN2401/2400 sandwich pack
63
About circuit-pack carriers
64
Before you begin the upgrade
65
Preparation and process steps
65
Make the Blowback Tape
68
• Task List: G3iV4 to Avaya Communication Manager
68
Verify the required hardware [G3V4 to from R5/R6/R7/R8si]
70
Provide the required tools [from G3V4]
71
Go to the RFA website [from G3V4]
72
G3V4 through Release 9si upgrades only
72
Direct connection between the switch and RFA
72
No connection between the switch and RFA
73
If you have problems with RFA
73
Pre-upgrade administration [from G3V4]
74
Check existing software load [from G3V4]
75
Verify system status [from G3V4]
75
Disable scheduled maintenance and alarm origination [from G3V4]
76
Record all links and remove only ISDN interface links [from G3V4]
76
Save translation [from G3V4]
77
Save translation, duplicated system [from G3V4]
78
Save announcements (TN750 or TN750B only) [from G3V4]
78
Shut down DEFINITY LAN Gateway [from G3V4]
79
Shut down DEFINITY AUDIX system [from G3V4]
79
Power down PPN [from G3V4]
80
Remove translation card and CPP1, TN777B,
and TN786B circuit packs [from G3V4]
81
Install TN2404 and TN2401 circuit packs and
original translation card [from G3V4]
81
Verify TDM cables and terminators [from G3V4]
81
Power up [from G3V4]
82
Deliver or install the License File [from G3V4]
83
New Duplicated G3r installations only
83
New simplex and upgraded G3r only
83
New or upgraded G3si only
84
Direct connection between the switch and RFA
84
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...