Bring the System Online
Activate the System
460
SI Installation and Upgrades
June 2004
7
Disconnect the terminal from the data module and reconnect the data module to the system
cabling.
Return to Task List
Set the 7400B+ Data Module Options
Return to Task List
1
Set the DIP switches for the 7400B+ using
DIP Switch Settings (7400B+) on page 460
.
The DIP switches are located inside the unit. To access them, remove the power cord from the
unit, remove the cover from the top rear of the unit, set the dip switches, replace the cover, and
connect the power cord.
The unit performs a self test.
2
If any switches were set in step 1, cycle the power to the data module so that the firmware can
read the new switch settings.
Return to Task List
Activate the System
Return to Task List
NOTE:
To prevent unnecessary trouble tickets, do not enable the system alarms (Alarm
Origination feature) until all installation and administration procedures are completed.
CAUTION:
It may be necessary to reseat circuit packs. To prevent damage from static electricity,
always wear an Electromagnetic Compatibility (EMC) wrist strap when handling all
system components.
DIP Switch Settings (7400B+)
Option
DIP Switch
Setting
No Telephone Connected
1
On
Data Metering
5
Off
Suppress Touch-tone/Dial Tone
6
Off
Speakerphone Disable/Enable
7
Off
Busyout on Local Loop
8
Off
Unused DIP Switches
2, 3, and 4
Off
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...