Return to Task List
1
Place the Z113A Cable Slack Manager against the wall under the MDF. See
Figure 163, Cable
Routing Through Cable Slack Manager (SCC1),
on page 442. Align the left side of the cable slack
manager with the first terminal block of the trunk/auxiliary field.
2
Place the next cable slack manager beside the previously installed unit. Align the tabs and
interlocks and snap the units together.
3
Repeat Step 2 until all cable slack managers are installed.
NOTE:
Nine 1/4-in. holes (0.63 cm) are provided in a cable slack manager base if earthquake
mounting is required. If a base is mounted on an uneven floor, shims may be required for
leveling and to assure proper fit of the covers.
Holes are provided in the sides of the base for bolting cable slack manager together. Bolts
and shims must be obtained locally.
4
The system cables will route through the cable slack manager as shown. Complete cable routing is
covered later in this chapter.
Cable clamps are required in installations with cable slack managers. At the rear of the cabinets, install 2
cable clamps using the screws provided. These clamps hold the 25-pair input/output or MDF cables in
place.
Figure 162, Cable Routing Through Cable Slack Manager (MCC1),
on page 441 and
Figure 163,
Cable Routing Through Cable Slack Manager (SCC1),
on page 442 show cable clamp placement and
cable routing.
Figure 162: Cable Routing Through Cable Slack Manager (MCC1)
:
Figure notes
1
Top of Cabinet
2
Cable Slack Manager
3
Cable Clamp
4
Spare Center Troughs
5
Cabinet Trough for Port Cables
cbdfflr CJL 102396
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...