System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
270
SI Installation and Upgrades
June 2004
Figure 67: Locations of ground plate cabinet clip and battery
Return to Task List
Verify TDM cables and connectors [75 XE upgrade]
Return to Task List
Verify that the system has the correct TDM/LAN cables and TDM terminators installed. Using this table
as a reference, visually inspect the PPN and EPN connections.
Return to Task List
Cabinet
TDM/LAN cable
TDM Terminator
SCC1
WP-91716 L3
AHF110
MCC1
WP-91716 L6 and L7 (older cables have blue
labels; yellow labels are newer)
ZAHF4
CABINET
CLIP
GROUND
PLATE
BATTERY
SIDE VIEW
2-CABINET PORT NETWORK
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...