System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
228
SI Installation and Upgrades
June 2004
28
Interconnect Port Networks - Dual cabinet (EPN) upgrade only [75 XE upgrade]
29
Install ground plate(s) [75 XE upgrade]
(skip this step if Earthquake protection is used)
30
Install cabinet clip(s) [75 XE upgrade]
(skip this step if Earthquake protection is used)
31
Verify TDM cables and connectors [75 XE upgrade]
. If new TDM terminators and cables are
required but have not yet been installed, install them now.
32
Connect power and grounding and the SAT terminal [75 XE upgrade]
33
Close PPN stack without earthquake protection [75 XE upgrade]
or
Close PPN stack with
earthquake protection [75 XE upgrade]
34
Install cable clamps [75 XE upgrade]
35
Power up and set date, time, and daylight savings rule [75 XE upgrade]
36
Enable customer options and alarm origination [75 XE upgrade]
(You identify the upgrade as R7
or R8 here.)
37
Verify the upgrade [75 XE upgrade]
Restore any customer-placed busy-outs before you run the acceptance tests!
38
Run acceptance tests [75 XE upgrade]
39
Retranslate port circuits [75 XE upgrade]
if necessary
40
Readminister translation [75 XE upgrade]
if necessary
41
Rerecord announcements [75 XE upgrade]
42
Save announcements and translation [75 XE upgrade]
43
Register the upgraded switch [75 XE upgrade]
44
Return equipment to MSL [75 XE upgrade]
Verify the required hardware [75 XE upgrade]
Return to Task List
This equipment must be on-site before the upgrade begins. Ensure that the translation memory card is
current and, if necessary, contains 4 Mbytes of memory.
The TSC cannot source equipment for you.
To place a claim for missing equipment as part of the Streamlined Implementation process, call 1-800-
772-5409 and respond to the call prompter, or call the number provided by your Avaya representative.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...