Test the System
LED Indicators
494
SI Installation and Upgrades
June 2004
Figure 188: Sample Test Results for Expansion Interface Board 2A01
Return to Task List
Test Time Division Multiplexing Bus for Each Expansion Port Network
Return to Task List
Check each TDM bus for each Expansion Port Network (EPN) in the system.
1
Type
test tdm port-network
2
and press Enter.
2
Verify a test results screen similar to
Figure 189, Sample Test Results for TDM Bus Port Network
2,
on page 494 is displayed.
3
If result is
FAIL
for any test, check the connectors of the TDM bus cables in Processor Port
Network (PPN) 2.
4
Repeat these steps for each Expansion Port Network (EPN) to check the TDM bus cables.
Figure 189: Sample Test Results for TDM Bus Port Network 2
Return to Task List
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
02A01 EXP-INTF 237 PASS
02A01 EXP-INTF 238 PASS
02A01 EXP-INTF 240 PASS
02A01 EXP-INTF 241 PASS
02A01 EXP-INTF 244 PASS
02A01 EXP-INTF 316 PASS
test tdm port-network 2
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
PN 02A TDM-BUS 294 PASS
PN 02A TDM-BUS 296 PASS
PN 02A TDM-BUS 297 ABORT 1005
PN 02B TDM-BUS 294 PASS
PN 02B TDM-BUS 296 ABORT 1005
PN 02B TDM-BUS 297 PASS
Command successfully completed
Command:
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...